This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

AgSTAR

Interconnection Guidelines

The Interconnection Guidelines provide general guidance on the steps involved with connecting biogas recovery systems to the utility electrical power grid. Interconnection best practices, including time and cost estimates, are discussed. The guidelines provide a general overview of interconnection requirements and can be used to help negotiate acceptable interconnection terms.