This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Ambler, Pennsylvania

BoRit Asbestos Superfund Site Photos

BoRit Asbestos Superfund Site Photos - Ambler Asbestos Piles Superfund Site Photos -
Ambler Superfund Site Home Page

10-20-2015: View of the Wissahickon Waterfowl Preserve pond being refilled after it was reinforced and capped during EPA Removal Action. Click here to open full size image.
10-20-2015: View of Wissahickon Waterfowl Preserve pond showing island and rockpile enhancements constructed during Removal Action to improve habitat for migatory birds and other aquatic life. Click here to open full size image.10-20-2015: Another view of the Wissahickon Waterfowl Preserve pond being refilled after it was reinforced and capped during EPA Removal Action. Click here to open full size image.On the Left BoRit  in the 1930's and on the right BoRit in 2008.Aerial Views of BoRit. On the left is from the 1930's and on the right (2008) (©Salvatore A. Boccuti)BoRit Superfund Site Park Parcel (July 2008)BoRit Superfund Site Park Parcel (July 2008) (©Salvatore A. Boccuti)BoRit Superfund Site - Phase I Removal Activities Before and AfterPhase I Removal Activities Before (on the left) and After (on the right).Phase 1 Removal Activities, Before (on the left) and After (on the right).Phase 1 During Removal Activities.Removal of ABESTOS-Containing Materials from Rose Valley Creek (2009).Phase 2 During Removing (on the left) and After on the right. (©Salvatore A. Boccuti).Exposed Area - Pile PropertyPhase IV During Removal Activities (on the left) and Open Section (on the right).BoRit - Phase V During (on the left) and After Removal Action (on the right).BoRit Pile During Removal Action on the left and After Capping (Approximately 2012) on the right(©Salvatore A. Boccuti).Installation of piezometers.Collecting a composite soil sample on W. Maple Street.Collecting a surface soil sample underneath a swing at the Kids’ Park on Maple and Oak Street.Hand augering a soil sample.Setting up to sample “Former Fire Training” Area.Drilling monitoring well MW-01 and air sampling.Set-up to drill monitoring well MW-6.Activity Based Sampling – Raking Scenario.Activity Based Sampling – Mowing Scenario.