An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Does the Asbestos Model Accreditation Plan (MAP) require that a written design plan be prepared by an accredited project designer before a covered response action begins inside a school or public and commercial building?