Yes. Both the visual inspection and the abatement were not properly completed under 40 CFR part 763.90(i)(1). The loose debris should be removed and the area thoroughly re-cleaned. Air monitoring should be repeated using TEM analysis for the functional space where the original abatement occurred. (40 CFR part 763.90(f) and (i))