List of application documents for the Northeast Gateway Energy Bridge Deepwater Port, Federal Waters of Massachusetts Bay (Modification to Existing Permit LNG Regasification Vessel/DWP Project).
More documents related to this project.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- Application for Minor Source Air Permit Modification (Northeast Gateway Energy Bridge Deepwater Port Project) (PDF)(86 pp, 2 MB, October 2008)
- Letter from Northeast Gateway Energy Bridge, LLC to EPA Re: Amendment to Permit Modification Application for Northeast Gateway Energy Bridge, LLC (PDF)(3 pp, 31 K, July 17, 2009)
- Re: Revised BACT analysis information (PDF)(19 pp, 2 MB, January 26, 2010)
- Northeast Gateway Energy Bridge LP (CAA Permit No. RG1-DPA-CAA-01) Supplemental Material for Main Boiler SO2 BACT Anaylsis and Auxiliary Generator CO Emissions Compliance (PDF)(24 pp, 11 MB, August 19, 2011)
- Northeast Gateway Energy Bridge LP (CAA Permit No. RG1-DPA-CAA-01) Clarification of Manufacturer Statement on Burner Lightings, Proposed Operating Restrictions for Diesel Engines, and Revised 1-hour SO2 Impacts (PDF)(16 pp, 5 MB, April 2, 2012)
- Comments on CAA Air Permit Modification Northeast Gateway Energy Bridge, LLC, Permit Number RG1-DPA-CAA-01 (PDF)(26 pp, 5 MB, October 28, 2014)