List of draft permit & supporting documentation for the Northeast Energy Associates, Bellingham, MA (Gas Turbine/Amended PSD Project).
More documents related to this project.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- Prevention of Significant Deterioration Permit for Northeast Energy Associates, 92B Depot Street, Bellingham, MA, Nominal 304 MW Combustion Turbine Combined Cycle Generating Facility, EPA Proposed Permit Number CR-88-PSD-R-001 (PDF)(16 pp, 63 K)
- Fact Sheet: Northeast Energy Associates, 92B Depot Street, Bellingham, MA, EPA Draft Permit (PDF)(14 pp, 250 K, October 28, 2008)
- Oil-Fired Opacity Evaluation Bellingham Cogeneration Facility (PDF)(3 pp, 238 K, June 18, 2007)
- Oil-Fired Opacity Limit Bellingham Cogeneration Facility (PDF)(8 pp, 442 K, August 20, 2007)
- Startup & Shutdown Limits Bellingham Cogeneration Facility (PDF)(14 pp, 402 K, June 29, 2007)
- CO Startup & Shutdown Limits Bellingham Cogeneration Facility (PDF)(2 pp, 100 K, October 4, 2007)