This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Proposed Minor NSR Permit: Deseret Power Electric Cooperative - Bonanza Power Plant

This page contains the proposed minor NSR permit, technical support document, public notice bulletin, application and other supporting documentation for the Deseret Power Electric Cooperative Bonanza Power Plant, located on Indian country lands within the Uintah and Ouray Indian Reservation in Utah.   The public comment period for this proposed permit began on December 22, 2015 and ended at 5:00 PM MST on January 21, 2016.

The final permit was issued on February 11, 2016.  This page is being maintained for informational purposes only.

*Note*: The Administrative Docket is in PDF portfolio format.  For best viewing and downloading, once the file is open, select the "Files" tab on the upper gray toolbar.  

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.