An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Compliance

Asbestos Demolition and Renovation Compliance Monitoring

EPA, state and local air program inspectors inspect renovation and demolition sites to determine compliance with the Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP), 40 CFR sections 61.140 through 61.157.

Inspectors:
  • review notification documents
  • inspect job sites
  • collect physical evidence necessary to document compliance or noncompliance

The Asbestos NESHAP program focuses on renovation and demolition activities and waste disposal sites. It applies to asbestos generation during mining, manufacturing/fabricating, renovation and demolition and waste disposal.

Depending upon the type of operation, owners and/or operators may be required to:
  • notify the appropriate state or local air program authority
  • conduct a thorough self-inspection
  • use renovation and/or demolition techniques that do not cause visible emissions

Regulated material removed during a renovation or demolition must be managed and buried in an approved landfill.

Questions and answers about the asbestos NESHAP.