This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Cooling Water Intakes

Cooling Water Intakes -​ Final 2014 Rule for Existing Electric Generating Plants and Factories

Photo - Cooling towersThis rule covers roughly 1,065 existing facilities that are designed to withdraw at least 2 million gallons per day of cooling water. EPA estimates that 521 of these facilities are factories, and the other 544 are power plants.
  • Final Rule: Federal Register Notice (August 15, 2014)
  • Support documents, including
    • Fact sheet and news release
    • Technical Development Document
      Engineering analysis of technologies and costs
    • Economic Analysis
      Economic cost and impact analyses
    • Benefits Analysis
      Analysis of environmental impacts and benefits of regulation of cooling water intakes
  • Docket Information: The supporting record for the final rule is available at Regulations.gov. The docket number for the rule is EPA-HQ-OW-2008-0667
  • Proposed Rule (2011), related notices