- Interim Final Rule (PDF)(7 pp, 1 MB, March 23, 1977, 42 FR 15690)
- Supplement for Pretreatment to the Development Document for the Steam Electric Power Generating Point Source Category (PDF)(258 pp, 9 MB, April 1977, 440/1-77/084)
- Proposed Rule (PDF)(2 pp, 276 K, 10/8/1974, 39 FR 36210)