Includes, but not limited to, documentation related to the consolidated work plan, sampling analysis plan, containment plan and modifications to the air sampling plan.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.-
Enbridge Soil Staging, Decontamination and River Access Site Closure Plan - January 11, 2011 (PDF)(102 pp, 29 MB)
Closure Plan intended to define conditions at the Sites occupied and used by Enbridge.
-
Enbridge 2011 Containment Plan - March 4, 2011 (PDF)(7 pp, 5 MB)
Supplement to Operations and Maintenance Work Plan Referred to as 2011 Containment Plan - March 2011
-
Enbridge's Overbank and Poling Reassessment Workplan - revised April 15, 2011 (PDF)(20 pp, 8 MB)
Supplement to the Response Plan for Downstream Impacted Areas and the Source Area Response Plan Commonly Referred to as the "Overbank and Poling Reassessment Work plan" - April 15, 2011
-
Enbridge Work Plan: Transfer of Operations from Site A to Frac Tank City - May 13, 2011 (PDF)(6 pp, 782 K)
Enbridge work plan for combining two support facilities: Site A and Frac Tank City. Prepared 20110418; revised 20110513.
-
Addendum to the revised Waste Treatment, Transportation and Disposal Plan - Approved June 20, 2011 (PDF)(4 pp, 341 K)
Purpose, generator knowledge and oil recovery documentation to Waste Characterization and Oil Recovery Sampling for Soils and Sediment
-
2011 Air monitoring and sampling addendum to the sampling and analysis plan - June 21, 2011 (PDF)(166 pp, 5 MB)
Approved Enbridge plan to conduct air sampling and air monitoring to protect worker safety and public health during assessment and recovery operations.
-
Enbridge Request for Modification to Air Monitoring and Sampling - Sept. 9, 2011 (PDF)(2 pp, 55 K)
Enbridge's request for modification of the 2011 Air Monitoring and Sampling Addendum dated June 21, 2011 (Turn-around time)
-
Enbridge Consolidated Work Plan for Activities through 2012 - Oct. 20, 2011 (PDF)(316 pp, 39 MB)
Addendum to the response plan for downstream impacted areas, Supplement to source area response plan, and supplement to response plan for downstream impacted areas, referred to as operations & maintenance work plan
-
Enbridge Consolidated Work Plan for Activities through 2012 - Dec. 21, 2011 (PDF)(79 pp, 2 MB)
Consolidated work plan report only without appendices.
-
Enbridge Consolidated Work Plan for Activities through 2012 (attachments and images) - Dec. 21, 2011 (PDF)(18 pp, 52 MB)
attachments and images Enbridge Consolidated Work Plan for Activities through 2012