Work plans submitted by Enbridge in 2010 and EPA Notices approving or disapproving them.
The components of the work plan are:
- Health and Safety Plan
- Pipeline Repair workplan
- Sampling and Analysis Plan
- Quality Assurance Project Plan (QAPP)
- Oil Containment and Recovery Plan
- Source Release Area Remediation Plan (SAR)
- Remediation Plan for Downstream Impacted Areas (RPDIA)
- Waste Treatment, Transportation and Disposal Plan
See also Final Approved Enbridge Work Plans - August 2010
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.-
U.S. EPA Notice of Approval With Modifications of Enbridge Pipeline Repair Work Plan - Aug. 3, 2010 (PDF)(2 pp, 943 K)
EPA's approval of Enbridge pipeline repair Work Plan submitted Aug. 2, 2010.
-
EPA Notice of Rejection of Enbridge Sampling and Analysis plan - Aug. 3, 2010 (PDF)(5 pp, 2 MB)
EPA rejects Enbridge's Sampling and Analysis plan submitted Aug. 2, 2010.
-
U.S. EPA Notice of Approval With Modifications of Enbridge's Waste Treatment, Transportation and Disposal Plan - Aug. 3, 2010 (PDF)(2 pp, 1 MB)
EPA's approval with modifications of Enbridge waste treatment and disposal plan submitted Aug. 2, 2010
-
U.S. EPA Supplemental Notice of Approval With Modifications of Enbridge's Pipeline Repair Work Plan - August 4, 2010 (PDF)(2 pp, 54 K,
Aug. 4, 2010)
EPA approval with additional modifications of Enbridge pipeline repair Work Plan submitted Aug. 2, 2010.
-
Enbridge Health & Safety Plan - August 4, 2010 (PDF)(229 pp, 70 MB)
Health and Safety Plan with guidance and requirements for workers on response to Enbridge pipeline oil spill in Marshall, Mich.
-
U.S. EPA Notice of Approval With Modifications of Enbridge Health and Safety Plan - Aug. 5, 2010 (PDF)(2 pp, 429 K)
EPA's approval with modications of Enbridge health and safety plan submitted Aug. 2, 2010.
-
Enbridge Pipeline Repair Work Plan (COMPLETE) - revised Aug. 5, 2010 (PDF)(363 pp, 76 MB)
Enbridge plan to repair pipeline 6B after oil spill in Marshall, Mich.
-
U.S. EPA Supplemental Notice of Approval With Modifications of Enbridge's Waste Treatment, Transportation, and Disposal Plan - Aug. 7, 2010 (PDF)(2 pp, 646 K)
EPA supplemental modification of Enbridge waste treatment, transportation and disposal plan
-
EPA Notice of Disapproval of Enbridge Aug. 2, 2010 Source Release Area Remediation Plan - Aug. 10, 2010 (PDF)(8 pp, 165 K)
EPA disapproves Enbridge's August 2, 2010 Source Area Release Plan and requires the final plan to be submitted by August 12, 2010.
-
EPA Notice of Disapproval of Enbridge Downstream remediation plan - Aug. 10, 2010 (PDF)(17 pp, 825 K)
EPA's Notice of Disapproval of Enbridge's Aug. 2, 2010 Downstream Remediation Plan
-
EPA Notice of Disapproval of Enbridge sampling analysis and QA plans - Aug. 11, 2010 (PDF)(13 pp, 222 K)
EPA's disapproval of Enbridge Energy's sampling analysis and quality assurance plans related to the Marshall Michigan Oil Spill
-
U.S. EPA Notice of Disapproval of Enbridge's Sampling and Analysis Plan and Quality Assurance Project Plan (PDF)(7 pp, 201 K,
Aug. 15, 2010)
EPA disapproves Enbridge's Sampling and Analysis Plan and Quality Assurance Project Plan submitted Aug. 2 & Aug. 11, 2010
-
US EPA Notice of approval with modifications of Enbridge's Aug. 15, 2010 submission - Aug. 17, 2010 (PDF)(2 pp, 58 K)
EPA approval with modifications of Enbridge's SAR Plan, RPDIA, SAP and QAPP submitted 8/15/2010