An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Enforcement

Guidance: CERCLA Future Response Costs: Settlement, Billing and Collection

Memorandum addresses some of the most common issues that arise with the billing and collection of future response costs. The information presented in the memorandum is largely based on the May 2001 model RD/RA consent decree language (superseded). Deviations from the model may lead to other strategies for billing and collection of future response costs. Issued 6/20/2002.
 
Current model RD/RA CD was issued in 2014.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.