Will EPA conduct sampling in local parks in the Norwood community?
EPA will sample Norwood Park because of its close proximity to the Old Norwood Dump and Norwood Landfill. There is no current information that would warrant sampling in other parks.
An official website of the United States government
Here’s how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
EPA will sample Norwood Park because of its close proximity to the Old Norwood Dump and Norwood Landfill. There is no current information that would warrant sampling in other parks.
This EPA website (www.epa.gov/norwood) is dedicated to the investigations in the Norwood community. We encourage you to use the site and submit any questions you might have through the form that appears on the website. We also welcome any feedback you might have on the webpage.
The www.epa.gov/norwood website is the site with the most accurate and up-to-date information regarding EPA’s investigations in the Norwood community.
No. Generator sets (gen sets) are a combination of oil-filled operational equipment and a bulk storage container. Lubrication systems on gen sets may be oil-filled operational equipment, but bulk storage tanks providing fuel for the generator typically are not oil-filled operational equipment.
What types of oil does the Spill Prevention, Control, and Countermeasure (SPCC) Rule address? The term oil means oil of any kind or in any form, including, but not limited to: petroleum; fuel oil; sludge; oil refuse; oil mixed with wastes other than dredged spoil; fats, oils or greases of…
No. Milk and milk product containers, piping and appurtenances are subject to regulatory standards and requirements for safe human consumption. These standards also serve to prevent discharges to waters of the U.S. Additional information about the exemption for milk and milk product containers, associated piping, and appurtenances is available.
What are the Spill Prevention, Control, and Countermeasure (SPCC) compliance dates for farms? On November 22, 2011, EPA amended the date by which certain farms must prepare, or amend, and implement their SPCC Plans to May 10, 2013 to comply with SPCC rule amendments promulgated since July 2002 (76 FR…
How do I determine if my facility could reasonably discharge oil into or upon navigable waters or adjoining shorelines? This determination is based solely upon a consideration of the geographical and locational aspects of the facility. The location of the facility must be considered in relation to streams, ponds and…
The compliance date for the owner or operator of a facility to comply with the SPCC requirements for these milk and milk product containers was delayed one year from the effective date of a final rule specifically addressing them, or as established by rule. This was to provide time for…
A mobile refueler is a bulk storage container onboard a vehicle or being towed that is designed or used solely to store and transport fuel for transfer into or from an aircraft, motor vehicle, locomotive, vessel, ground service equipment, or other oil storage container. Mobile refuelers may be found at…
Pursuant to 40 CFR §112.8(c)(2), mobile refuelers are exempt from the secondary containment requirements for bulk storage containers. Are mobile refuelers also exempt from the requirements for integrity testing in §112.8(c)(6)? Since mobile refuelers are mobile or portable bulk storage containers, the other provisions of §112.8(c) still apply. Therefore, mobile…
Yes. Facilities that meet the criteria for qualified facilities and qualified oil-filled operational equipment may benefit from both of the alternative approaches. Since an impracticability determination is not necessary for qualified oil-filled operational equipment, the owner/operator can self-certify the SPCC Plan and is not required to have a PE develop…
Does a facility automatically lose eligibility for the option for qualified oil-filled operational equipment if the equipment has an oil discharge? No. Facilities that choose this alternative and later have a reportable oil discharge from qualified oil-filled operational equipment do not automatically lose eligibility. However, the spill reporting requirements would…
What key elements should I include in my Facility Response Plan? As you prepare your FRP, be sure that your plan includes the following elements: Emergency Response Action Plan (an easily accessible stand-alone section of the overall plan) including the identity of a qualified individual with the authority to implement…
The FRP regulations require facilities to prepare an emergency response action plan and identify a qualified individual that has full authority, including contracting authority, to implement removal actions (40 CFR §112.20(h)(i)). What is the definition of a qualified individual? The relevant statute, CWA 311(j)(5)(C)(ii) requires that the plan identify the…