An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Freedom of Information Act (FOIA)

Approval of Groundwater Interim Measures Plans and Commencement of Work RCRA 3008(h) Administrative Order on Consent

Contains letter in response to Walter Coke (WC) submittals to EPA for three Groundwater Interim Measures (OW IM) plans pursuant to the September 2012 RCRA 3008(h) Consent Order, and according to the final May 2012 Groundwater Interim Measures Work Plan (OW IM Work Plan) for the Former Chemical Plant (FCP). These plans, prepared by Terracon Consultants, Inc., have been revised to address EPA comments on draft versions of the plans.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.