This work plan (571-pages) is called the “SWMU-3-1 and 3-4 Control and Containment Design Report” was written to be in compliance with new FEMA requirements that the design must not create any positive change in the 100 year flood elevation. As such, this report replaces an earlier report (May 22, 2009) which was revised and updated. The report describes the conceptual design and rationale for the control and containment of releases from two areas on-site of the Cavenham Forest Industries facility. The report includes: current conditions; measures; alternative measures; project management and construction/implementation.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- Control And Containment Design Report (PDF)(571 pp, 86 MB, September 15, 2011)