An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Freedom of Information Act (FOIA)

Final Groundwater Interim Measures Sampling and Analysis Plan

Final Groundwater Interim Measures Sampling and Analysis Plan. Revision 1.0; October 9, 2012. This document serves as the quality assurance and quality control document for the groundwater sampling performed during the Interim Measure, both for the area of the former chemical plant located on the site and for the off-site area east. 

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.