This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Freedom of Information Act (FOIA)

Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama

Groudwater Interim Measures Work Plan Addendum for the Former Chemical Plant, Walter Coke, Birmingham, Alabama. February 11, 2011. 

This Addendum presents minor modification to the well locations proposed in the original Interim Measures Work Plan and proposes performance monitoring. This Addendum also addressed EPA's comments. 