An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Freedom of Information Act (FOIA)

Groundwater Interim Measures Work Plan for the Former Chemical Plant

May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B, and referenced as needed.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.