Interim Measures Annual Report (August 24, 2017): This report covers the ongoing Groundwater Pump-and-Treat Interim Measures originally approved back on December 4, 2012. This Interim Measures addresses the groundwater plume associated with SMA 4 – The Former Chemical Plant. This report is the last Interim Measures Report submitted prior to EPA public noticing the proposed remedy for SMA 4.
Interim Measures (IM) June 2016 - May 2017 Report
ERP Compliant Coke, LLC
3500 35th Avenue North
Birmingham, Jefferson County, Alabama
USEPA ID No. ALD 000 828 848
Terracon Project No. E1167304
- Interim Measures Annual Report (PDF)(157 pp, 9 MB, August 24, 2017)