Quarterly Progress Report #15 (July 15, 2016): The Progress Report covers the period from April 1, 2016 to June 30, 2016.
Corrective Measures Studies
- The Corrective Measure Study (CMS) SMA 5 – Former Pig Iron Foundry (Revision 1.1) was submitted to EPA on May 20, 2016.
- The CMS SMA 4 – Former Chemical Plant (Revision 1.0) was submitted to EPA on June 3, 2016.
- Quarterly Progress Report #15 April-June 2016 (PDF)(2 pp, 79 K, July 15, 2016)