This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Fuels Registration, Reporting, and Compliance Help

Are engineering drawings and process and instrumentation diagrams (P&IDs) required to be submitted as part of the engineering report?

Engineering drawings or P&IDs are not required to be submitted in the engineering report, but EPA suggests the third party engineer provide a simple diagram to help supplement the description of the process train for each renewable fuel pathway at the production facility.

The diagram can be presented in simple block and arrows format, which may include for each step along the process train, feedstock input, process unit, process fuel heat input, co-products produced, etc.