An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Fuels Registration, Reporting, and Compliance Help

Must batch numbers be assigned in both numerical and chronological order?

Batch numbers should be assigned in numerical and chronological order of production (not shipment). If a batch of gasoline must be re-blended because it is out of specification, and an independent laboratory has already sampled the batch, the resulting batch must be assigned a new ID.

The volume of the original batch ID should then be reported to EPA as zero. If an independent lab has not sampled the original batch, the refiner may retain the original batch number. In either case, the refiner should ensure that records are kept on the nature of the contamination, corrective measures and original and subsequent sampling and testing.(7/1/94)

This question and answer was posted at Consolidated List of Reformulated Gasoline and Anti-Dumping Questions and Answers: July 1, 1994 through November 10, 1997 (PDF)(333 pp, 18.17 MB, EPA420-R-03-009, July 2003, About PDF)