Remediation and Restoration Projects for the Grand Calumet River AOC
Project Title | Project Description | Date Completed | Targeted BUI(s) |
---|---|---|---|
Great Lakes Legacy Act – Lake George Canal East and Middle Sections Remedial Action | This project is remediating contaminated sediment in the Middle and East Sections of the Lake George Canal. | 2024 (est.) |
|
Prescribed Fire Implementation | This project will use prescribed fire as a tool for controlling invasive plant species and promoting the re-establishment of native species on over 700 acres of habitat. | 2021 (est.) |
|
Pine Station Nature Preserve Ponds and Oxbow Restoration Design | This project will design restoration work to decrease invasive species and increase habitat quality at Pine Station. | 2021 (est.) |
|
Dune, Swale, and Shelf Wetlands Restoration | The project will restore globally rare dune and swale habitat and riverine wetlands through the control of woody and herbaceous invasive species. | 2021 (est.) |
|
Lake George Wetlands Restoration |
Herbicide application and invasive species control will improve ~80 acres of wetland habitat surrounding the Lake George branch of the Indiana Harbor Canal and George Lake. |
2020 (est.) |
|
Nearshore Bird Management Program at Grand Calumet AOC Beaches | The project mitigated the impacts of nuisance shorebirds and implemented gull management at Lake Michigan beaches within the Grand Calumet River AOC. | 2019 |
|
Great Lakes Legacy Act - Stateline Remedial Action | The project remediated 46,000 cubic yards of contaminated sediments and restored habitat near the Indiana/Illinois Stateline. | 2016 |
|
Great Lakes Legacy Act - East Branch Remedial Action | This project remediated 1.1 million cubic yards of contaminated sediments and restored habitat between Kennedy and Cline Avenues. | 2015 |
|
Great Lakes Legacy Act – Roxana Marsh, Reaches 1 and 2 Remedial Action | This project dredged and capped 585,000 cubic yards of contaminated sediment and restored habitat in Roxana Marsh. | 2012 |
|
Great Lakes Legacy Act – West Branch Remedial Action | This project dredged and capped ~148,000 cubic yards of contaminated sediment and restored habitat between Hohman and Columbia Avenues. | 2011 |
|