Below are additional documents for the Cleanup Plans and Documents page.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- Sediment Sampling Workplan Addendum, October 2017 (PDF)(71 pp, 8 MB)
- Revised 2016 Sediment Work Plan, October 2016 (PDF)(103 pp, 5 MB)
- SOW Attachment E, Operation, Maintenance & Monitoring Scope, December 2010 (PDF)(35 pp, 163 K)
- 2015 Supplemental Design Revisions, September 2015 (PDF)(35 pp, 5 MB)
- 2014 Final Design Report (FDR), June 2014 (PDF)(80 pp, 3 MB)
- 2014 Reach 7 Final Design Report (FDR), June 2014 (PDF)(83 pp, 5 MB)
- 2015 Remedial Action Work Plan (RAWP), June 2015 (PDF)(117 pp, 18 MB)
- Appendix A of the 2015 RAWP (PDF)(60 pp, 283 K)
- Appendix B of the 2015 RAWP (PDF)(14 pp, 794 K)
- Appendix D of the 2015 RAWP (PDF)(4 pp, 49 K)
- Appendix E of the 2015 RAWP (PDF)(3 pp, 49 K)
- Appendix F of the 2015 RAWP (PDF)(130 pp, 5 MB)
- 2015 Remedial Action Work Plan (RAWP) for CU60, June 2015 (PDF)(47 pp, 4 MB)
- 2014 Remedial Action Work Plan (RAWP), July 2014 (PDF)(124 pp, 28 MB)
- Appendix A of the 2014 RAWP (PDF)(18 pp, 131 K)
- Appendix B of the 2014 RAWP (PDF)(25 pp, 142 K)
- Appendix C of the 2014 RAWP (PDF)(114 pp, 3 MB)
- Appendix D of the 2014 RAWP (PDF)(101 pp, 617 K)
- Appendix E of the 2014 RAWP (PDF)(3 pp, 47 K)
- Appendix F of the 2014 RAWP (PDF)(150 pp, 14 MB)
- 2014 Remedial Action Work Plan (RAWP) for Reach 7 – Landlocked Area, June 2014 (PDF)(78 pp, 5 MB)
- Appendix A of the 2014 RAWP for Reach 7 (PDF)(38 pp, 4 MB)
- Appendix B of the 2014 RAWP for Reach 7 (PDF)(26 pp, 2 MB)
- Treatability Studies Work Plan Text and Tables (February 2004) (PDF)(84 pp, 1 MB)
- Treatability Studies Work Plan Figures (February 2004) (PDF)(20 pp, 4 MB)
- Treatability Studies Work Plan Appendices (February 2004) (PDF)(321 pp, 16 MB)
- Quality Assurance Project Plan (QAPP) For the Hudson River PCBs Site: Design Support Sediment Sampling and Analysis Program, October 2002, Revision 4 (PDF)(1385 pp, 13 MB)
- Design Support Sediment Sampling and Analysis Program Field Sampling Plan for Year 1, July 2002 (PDF)(64 pp, 2 MB)
- Phase 1 Remedial Action Community Health and Safety Plan, Rev. 3, May 2009 (PDF)(132 pp, 3 MB)
- Phase 2 Engineering Performance Standards, December 2010 (PDF)(124 pp, 844 K)