Some of Former Chevron Refinery Resource Conservation and Recovery Act corrective action documents and reports are accessible online:
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.
- 1st Quarter Progress Report (PDF)(5 pp, 255 K, Apr 2008)
- 2nd Quarter Progress Report (PDF)(5 pp, 240 K, Jul 2008)
- 3rd Quarter Progress Report (PDF)(5 pp, 250 K, Oct 2008)
- 4th Quarter Progress Report (PDF)(4 pp, 501 K, Jan 2009)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River (PDF)(33 pp, 296 K, Sep 2008)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River, Figures 1-3 (PDF)(3 pp, 2 MB, Sep 2008)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River Figures 4-8 (PDF)(5 pp, 1 MB, Sep 2008)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River: Appendix A: Performance Monitoring Plan (PDF)(37 pp, 1 MB, Sep 2008)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River: Appendix B: Report of Floodplain and Scour Analysis (PDF)(57 pp, 3 MB, Sep 2008)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River: Appendix C: Sheet Pile and Riprap Sizing Calculations (PDF)(12 pp, 2 MB, Sep 2008)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River: Appendix D: Riparian Bank Live Stakes Specifications (PDF)(3 pp, 105 K, Sep 2008)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River: Appendix E: Wetland Delineation Report (PDF)(43 pp, 4 MB, Sep 2008)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River: Appendix B: Report of Floodplain and Scour Analysis: Appendix F: Threatened and Endangered Species Habitat Assessment (PDF)(30 pp, 3 MB, Sep 2008)
- Remedial Measures Work Plan for Sheet Pile Barrier and Bank Stabilization along The Great Miami River: Appendix G: USEPA Correspondence (PDF)(2 pp, 248 K, Sep 2008)