Former Hoover Company Facility Resource Conservation and Recovery Act corrective action documents are accessible online:
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- January 2020 Sewer Gas Results (PDF)(1 pg, 368 K, March 2020)
- Operation and Maintenance Plan for the Phase 1 Sub-slab Depressurization Systems at the Former Hoover Facility - West Factory Area (PDF)(49 pp, 5 MB, September 2018)
- RCRA Facility Investigation - Conditional Workplan (PDF)(2 pp, 123 K, September 2018)
- Redacted RCRA Facility Investigation Workplan (PDF)(1000 pp, 280 MB, July 2018)
- Notice of Deficiency RCRA Facility Investigation Work Plan (PDF)(8 pp, 573 K, June 2018)
- Approval of Revised Current Conditions Report (PDF)(2 pp, 146 K, November 2017)
- Revised Current Conditions Report (Redacted) (PDF)(108 pp, 96 MB, May 2017 )
- Approval of Phase 1 Sub-slab Depressurization Design Report, Revision 1 (PDF)(2 pp, 114 K, March 2017)
- Documentation of Environmental Indicator Determination (PDF)(8 pp, 400 K, March 2017)
- Phase 1 Sub-slab Depressurization Design Report, Revision 1 (PDF)(100 pp, 7 MB, February 2017)
-
Administrative Order on Consent (PDF)(44 pp, 3 MB,
May 2016)
EPA's Administrative Order on Consent.
-
Fact Sheet (PDF)(2 pp, 161 K,
Feb 2016)
Vapor intrustion fact sheet.
-
Sampling Data Submittal (PDF)(48 pp, 2 MB,
Jan 2016)
Laboratory analytical reports.
-
Summary of Analytical Results (PDF)(204 pp, 2 MB,
Apr 2015)
Summary of analytical results from vapor and air sampling activities.
-
Annual Summary Report of Monitored Natural Attenuation (PDF)(24 pp, 722 K,
Feb 2007)
Summary analytical data for the monitored natural attenuation groundwater sampling events.