This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Hazardous Waste Cleanup: BAE Systems Land and Armaments LP (Formerly: United Defense, LP) in York, Pennsylvania

On this page:


    Cleanup Status

    The April 2018 Annual Operations and Maintenance Summary Report for the Groundwater Remediation Systems states that the Eastern Property Boundary Area (EPBA) groundwater remediation system operated as designed during the reporting period. After receiving EPA approval, the West Warehouse Area (WWA) groundwater remediation system was shut down in September 2016 for attainment monitoring. Four out of eight wells in the WWA contained concentrations of tetrachloroethene (PCE) above the maximum contaminant level (MCL) of 5 ug/L, with a maximum concentration of 26.8 ug/L during the reporting period. In the EPBA, four out of nine wells contained concentrations of PCE above the MCL, with a maximum concentration of 185 ug/L. Two out of nine wells in the EPBA also contained concentrations of trichloroethene (TCE) above its MCL of 5 ug/L, with a maximum concentration of 14 ug/L. The majority of wells in both the WWA and EPBA continue to exhibit stable or decreasing trends in contaminant concentrations.

    Cleanup Background

    The final remedy for the BAE Systems facility, consisting of groundwater treatment and monitoring and including institutional controls, was described in the March 2006, Final Decision and Response to Comments. The two groundwater treatment systems included in the final remedy, one in the WWA and one in the EPBA, have successfully captured and treated contaminated groundwater at the facility since the early 1990s.

    A long-term stewardship site visit was performed by EPA in May 2014. Remedial components were in good condition and operating as designed, and institutional controls restricting groundwater are enforced through an environmental covenant, ensuring that human health and the environment remain protected at the facility.

    The facility submitted a Notice of Intent to Remediate under Pennsylvania’s Act 2 program in June 2016 and was subsequently entered into the One Cleanup program by PADEP and EPA

    Top of Page


    Site Description

    Interactive map of BAE Systems Land & Armaments LP (Formerly: United Defense, LP), York, PA

    View larger map

    The facility is located approximately 5 miles southwest of the City of York, PA. Operations began in 1960. The facility produces armored defense vehicles for the U.S. Department of Defense.

    The facility historically used four impoundments for the treatment and storage of industrial and sanitary wastewaters. These impoundments were excavated, backfilled, and closed by the facility starting in 1989. The excavated material from the impoundments were then consolidated in the Minimum Technology Requirements (MTR) landfill, which was certified closed by PADEP in 1991.

    Top of Page


    Contaminants at this Facility

    The primary contaminants at the facility are PCE and TCE, which occur in groundwater beneath the facility at low levels. Potential exposures to this contamination have been eliminated by implementing on-site groundwater capture and treatment systems, providing public water to nearby residents, and providing institutional controls that restrict groundwater use. The low levels of remaining groundwater contamination are not expected to migrate off-site and are not expected to be of concern regarding vapor intrusion to indoor air. Contaminated soils have been removed or remediated at the facility.

    Top of Page


    Institutional and Engineering Controls at this Facility

    Institutional /Engineering Control Summary
    Restrictions or Controls that Address: Yes No
    Groundwater Use
    X
     
    Residential Use
     
    X
    Excavation
    X
     
    Vapor Intrusion
     
    X
    Capped Area(s)
    X
     
    Other Engineering Controls
    X
     
    Other Restrictions
    X
     

    As an additional protective measure, institutional controls prohibiting the development of on-site wells for domestic uses and banning the use of groundwater beneath the facility as a potable water supply were included in the final remedy. Excavation or disturbance of the MTR landfill and its capped area is also prohibited as part of their hazardous waste post-closure permit.

    Top of Page


    Land Reuse Information at this Facility

    BAE continues to use the facility to produce armored defense vehicles.

    Top of Page


    Site Responsibility at this Facility

    Resource Conservation and Recovery Act (RCRA) Corrective Action activities at this facility have been conducted under the direction of EPA Region 3.