This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Hazardous Waste Cleanup: C and D Technologies LLC (Carlile and Doughty) in Conshohocken, Pennsylvania

On this page:


Cleanup Status

In September 2015, EPA determined the site meat the Environmental Indicator for Human Exposures under Control. Before the site is occupied, the entire site will be capped with asphalt, concrete or two feet of soil/landscaping at conclusion of the construction.  EPA determined that  Enviromental Indicator -  Migration of Contaminated Groundwaterwas under control on  December 18, 2020.   

 
 



 

Top of Page


Site Description

Interactive Map of C and D Technologies LLC, Conshohocken, Pennsylvania


View larger map

Carlile and Doughty (C and D), Inc., also known by other names such as, C and D Technologies, Inc., C and D Technologies, LLC, C and D Batteries, and C and D Charter Power Systems, Inc., manufactured and tested lead-acid batteries from 1925 through 1985.  Subsequently the facility produced nickel-cadmium (Ni-Cad batteries).  When the facility ceased operations in 2002, operations were limited to battery testing, warehousing, and metal fabrication.  On December 31, 2002, C and D entered into a Consent Order-Agreement to sell the five-acre property (including a 130,000 square foot building, paved parking areas, and a 10,000-gallon AST) to Washington Street Associates, LP, of Blue Bell, Pennsylvania.  As of August 2008 the structures belonging to C and D have been demolished.  The property is undergoing remediation under Act 2.

Top of Page


Contaminants at this Facility

The main constituents of concern at the site are lead, arsenic benzo [a]pyrene, benzo [b] fluoranthene and di benzo [a,h] anthracene.

Top of Page


Institutional and Engineering Controls at this Facility

    The need for Institutional Controls has yet to be determined ; however, the Cleanup Plan for the facility identifies that the entire site will be capped with asphalt, concrete or two feet of soil/landscaping at conclusion of the construction.   

    Top of Page


    Land Reuse Information at this Facility

    The facility's future use is yet to be determined.

    Top of Page


    Site Responsibility at this Facility

    Resource Conservation and Recovery Act (RCRA) Corrective Action activities at this facility have been conducted under the direction of EPA Region 3.