This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Hazardous Waste Cleanup: Merck Sharp & Dohme Corporation in Linden Cities, New Jersey

On this page:

  • Cleanup Status
  • Site Description
  • Contaminants at this Facility
  • Site Responsibility

Cleanup Status

Site-wide investigations, which began in 1991, were completed in early 1999. The proposed cleanups target the contaminated groundwater and soils, the former north plant landfill, and Kings Creek. Proposed measures include pumping and treating contaminated groundwater, as well as excavating, treating and capping contaminated soil.

On October 7, 1999, EPA issued a RCRA permit, formally imposing the proposed cleanup measures. However, a citizen appealed the permit claiming that the investigations performed by Merck were questionable. However, the investigations were overseen by NJDEP and EPA. The EPA Permit Appeals Board denied the appeal and the permit became effective on August 1, 2000. In accordance with the permit's requirements, Merck submitted a remedial action work plan in October 2000 and is currently implementing the work plan.

Merck will continue to implement a remedial of the site. If deemed necessary, additional remedial measures will be implemented.


Site Description

The Merck facility is located at 126 East Lincoln Avenue in Rahway and Linden Cities, Union County, New Jersey on 210 acres. The facility is bordered by residential and industrial areas. The company develops and produces pharmaceutical products. The facility began operations in 1903.

New Jersey Department of Environmental Protection (NJDEP) issued a Resource Conservation and Recovery Act (RCRA) permit that allows the operation of the hazardous waste drum storage areas and storage tanks. EPA issued a RCRA permit and NJDEP issued an order, both of which require a cleanup of the entire site.


Contaminants at this Facility

Soils and groundwater at the site are contaminated with organic and inorganic compounds, pesticides and polychlorinated biphenyls. The sources of contamination are the research, manufacturing and waste management operations at the site.


Site Responsibility at this Facility

Resource Conservation and Recovery Act (RCRA) Corrective Action activities at this facility have been conducted under the direction of EPA Region 2.