Interim Measure Work Plan documents.
For more information, see Amphenol/Franklin Power Products in Franklin, Ind.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- EPA Approval of the Perimeter and Work Area Air Monitoring Work Plan (PDF)(1 pg, 125 K, August 23, 2019)
- EPA Conditional Approval of the Off-Site Interim Measure Work Plan (PDF)(10 pp, 311 K, August 8, 2019)
- Amphenol Off-Site Interim Measure Work Plan and Response to Comments (PDF)(256 pp, 51 MB, June 18, 2019)
-
EPA Approval Work Plan for Soil Sampling for Remedial Design (PDF)(2 pp, 96 K,
February 22, 2019 )
EPA work plan approval for remedial design soil sampling
-
Design-Level Data Soil Investigation Work Plan (PDF)(46 pp, 4 MB,
February 19, 2019 )
Work plan for soil sample collection to design the Interim Remedy.
-
Request for Interim Measure Work Plan (PDF)(6 pp, 165 K,
December 11, 2018)
Letter requesting that Amphenol submit work plan interim measure related to source control for vapor intrusion.