This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

EPA in Michigan

Electro-plating Services - I696 Release Site Photo Gallery

Photo gallery for Electro-plating Services - I696 Release Site

View of frozen yellow liquid at joint in the concrete wall
View of frozen yellow liquid at joint in the concrete wall
Temporary barrier completed
Temporary barrier completed
sump pump plumbed to frac tank
Sump pump plumbed to frac tank
Pump in pit opened in basement
Pump in pit opened in basement
Pumping od storm drain in basin
Pumping od storm drain in basin
OSC directing crews, I696 Release
OSC directing crews
Insulated plumbing connecting sump to frac tank
Insulated plumbing connecting sump to frac tank
Frac tank
Frac tank
Facing south looking at the point of release
Facing south looking at the point of release
Crew using auger to install sump
Crew using auger to install sump
Continued excavation of basement pit
Continued excavation of basement pit
Bumper trucks and frac tank
Bumper trucks and frac tank
Building and frac tank secured with fencing signsplaced on fencing
Building and frac tank secured with fencing signsplaced on fencing
Beginning of temporary barrier wall installation
Beginning of ice product removal from leak site on I696
Beginning of ice product removal from leak site on I696
Beginning of ice product removal from leak site on I696
Hand Auguering along the Water Line to investigate the soil and groundwater
Hand Auguering along the Water Line to investigate the soil and groundwater
Soil Boring along the South site of E. 10 Mile Road
Soil Boring along the South site of E. 10 Mile Road
Inspecting Soil Cores and preparing Boring Logs
Inspecting Soil Cores and preparing Boring Logs
Hand augering for sampling underneath the site building
Hand augering for sampling underneath the site building
Photo of completed interceptor trench and frac tank along the service drive
Photo of completed interceptor trench and frac tank along the service drive
Sub-slab sample collection at east adjoining property
Sub-slab sample collection at east adjoining property
Perimeter ambient air sample collection
Perimeter ambient air sample collection
Tanker truck for transportation and disposal of liquid in frac tank.
Tanker truck for transportation and disposal of liquid in frac tank.
Sump pump installed near I-696 to pump groundwater to upper frac tanks
Sump pump installed near I-696 to pump groundwater to upper frac tanks
Vacuum truck with high pressure pump cleaning out the storm sewer line along the service drive
Vacuum truck with high pressure pump cleaning out the storm sewer line along the service drive
View of the cured sanitary sewer liner at the man hole located on the Electro Plating Services property
View of the cured sanitary sewer liner at the man hole located on the Electro Plating Services property
Pre-injection groundwater sampling at RW-01
Pre-injection groundwater sampling at RW-01
View of liquid treatment chemicals being pumped into the basement sump
View of liquid treatment chemicals being pumped into the basement sump
View of injection slurry daylighting at nearby utility pole
View of injection slurry daylighting at nearby utility pole
ReDox Tech injecting slurry just north of the site building as part of the pilot scale treatment
ReDox Tech injecting slurry just north of the site building as part of the pilot scale treatment
24-inch storm sewer liner, partially cut until manhole sealing work is completed.
24-inch storm sewer liner, partially cut until manhole sealing work is completed.
Redox Tech injecting treatment slurry in the service drive
Redox Tech injecting treatment slurry in the service drive
Redox Tech installing a monitoring well for post-treatment performance monitoring
Redox Tech installing a monitoring well for post-treatment performance monitoring