This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

News Releases

News Releases from Region 02

EPA Extends Public Comment Period on Proposed Cleanup Plan to Address Groundwater Contamination at the Ringwood Mines/Landfill Superfund Site in New Jersey

02/24/2020
Contact Information: 
Elias Rodriguez (rodriguez.elias@epa.gov)
(212) 637-3664

RINGWOOD, N.J. The U.S. Environmental Protection Agency (EPA) has extended the public comment period for its proposed cleanup plan to address groundwater and mine water contamination at the Ringwood Mines/Landfill Superfund Site in Ringwood, New Jersey to April 2, 2020. EPA’s proposed plan to address contaminants in groundwater at the site provides for the installation of wells near the Peters Mine Pit and Peters Mine Pit Airshaft, perpendicular to the direction of groundwater flow, to introduce an oxygen-releasing compound into the aquifer to enhance the breakdown of contaminants.

EPA’s proposed plan also addresses contaminants in mine water in the Peters Mine Pit Airshaft by adding granular activated carbon and resin into the Peters Mine Pit Airshaft to treat contaminants. The Peters Mine Pit Airshaft would then be closed using conventional mine shaft closure technology. The specific technology will be determined during the design of the cleanup.

With these combined actions, EPA expects to address an ongoing source of groundwater contamination and help the aquifer to recover. This plan also provides for long-term groundwater and surface water monitoring with regular reporting to ensure the protection of drinking water resources.

Throughout the cleanup, EPA will monitor the cleanup progress and, after the remedy has been fully implemented, and conduct its statutory review of the cleanup at least every 5 years to ensure its effectiveness. Under the proposed plan, the estimated cost of cleanup is approximately $3.4 million.

The EPA held a public meeting to explain and to receive comments on the proposed plan on February 10, 2020 at 7:00 p.m. at the Martin J. Ryerson Middle School, 130 Valley Road, Ringwood, New Jersey.

Written comments on the proposed plan, postmarked no later than close of business April 2, 2020, may be mailed or emailed to: Joseph A. Gowers, Remedial Project Manager, U.S. Environmental Protection Agency, 290 Broadway, New York, NY 10007, Email: gowers.joe@epa.gov.

To view the EPA’s proposed plan for the groundwater and mine water at the site, please visit www.epa.gov/superfund/ringwood-mines

Follow EPA Region 2 on Twitter at http://twitter.com/eparegion2 and visit our Facebook page, http://facebook.com/eparegion2

20-012