Dewatering General Permit (DGP) for Massachusetts & New Hampshire
The Dewatering General Permit expires on May 20, 2020. All new dewatering activities eligible for the DGP must submit a complete NOI by May 8, 2020 in order to gain authorization before the permit expires. After this date, all dewatering activities must submit an NOI for coverage under the Remediation General Permit (RGP).
NOI ALERT: Due to widespread telework being implemented at the EPA Region 1 office in response to the COVID-19 outbreak, processing of hardcopy NOIs and other mail may be delayed due to limited staff availability in-office. At this time we encourage the submittal of NOIs via email to GeneralPermit.Dewatering@epa.gov to speed processing times.
Final Dewatering General Permit (DGP)
The Notice of Availability of the Final NPDES General Permit for Dewatering Activity Discharges in Massachusetts (MAG070000) and New Hampshire (NHG070000) was published in the Federal Register on April 20, 2015.
This General Permit replaces the Dewatering General Permit (DGP) that expired on September 30, 2013. The Final General Permit provides coverage for facilities with construction dewatering of groundwater intrusion and/or storm water accumulation from sites less than one acre and short-term and long-term dewatering of foundation sumps into waters of the Commonwealth of Massachusetts and the State of New Hampshire. The Final permit establishes permit eligibility conditions, notice of intent requirements, effluent limitations, standards, prohibitions, and best management practices. The eligibility requirements for coverage under the general permits are discussed in detail under Part 3 of the draft permit. The reader is strongly urged to go to that section to determine eligibility.
Owners and/or operators of facilities with dewatering discharges, including those currently authorized to discharge under the expired General Permits, will be required to submit a Notice of Intent (NOI) to be covered by the General Permit to both EPA-New England and the appropriate state agency. EPA and the State will review the NOI and the facility will receive written notification from EPA stating whether permit coverage and authorization to discharge under one of the general permits is approved.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.
- Federal Register Notice
- Final Dewatering General Permit (PDF) (22 pp, 305 K)
- Appendix I: Areas of Critical Environmental Concern (ACEC) in Massachusetts (PDF) (4 pp, 383 K)
- Appendix II: Summary of Marine Essential Fish Habitat Designations (PDF) (3 pp, 197 K)
- Appendix III: National Historic Preservation Act Review (PDF) (6 pp, 152 K)
- Appendix IV: Endangered Species Act Guidance and Eligibility Criteria (PDF) (9 pp, 436 K)
- Appendix V: Notice of Intent (NOI) Instructions and Suggested Formats (PDF) (9 pp, 205 K)
- Appendix VI: Notice of Termination (NOT) Instructions and Suggested Formats (PDF) (3 pp, 203 K)
- Appendix VII: Dilution Factor Calculations for Massachusetts and New Hampshire (PDF) (2 pp, 98 K)
- Appendix VIII: Test Methods and Minimum Levels for Groundwater Sources (PDF) (1 pg, 117 K)
- Appendix IX – Standard Conditions (PDF) (17 pp, 287 K)
- Fact Sheet (PDF) (19 pp, 330 K)
- Biological Assessment (PDF) (75 pp, 762 K)
- Response to Comments (PDF) (2 pp, 322 K)
EPA Contacts
Michelle Vuto (vuto.michelle@epa.gov), 617-918-1222
Newton Tedder (tedder.newton@epa.gov), 617-918-1038
State Contacts
MassDEP
Jennifer Wood (Jennifer.Wood@state.ma.us)
NHDES
Hayley Franz (Hayley.Franz@des.nh.gov), 603-271-0671
Notices of Intent
Notices of Intent (NOI) will be posted on this page for a minimum of 7 days after EPA receives them. Please contact Michelle Vuto if you have any questions regarding NOIs. See the table below for a chronological listing of NOIs. Older NOIs are listed in the Dewatering General Permit (DGP) NOI archive.
City / Town, State | Site / Address | Permit Number | Date Terminated | Date Issued | Date Posted |
---|---|---|---|---|---|
Boston, MA | 425 Border Street (PDF) (58 pp, 7.5 MB) | MAG070472 | 01/08/2020 | 12/27/2019 | |
Scituate, MA | Hatherly Country Club (PDF) (41 pp, 7.9 MB) | MAG070471 | 10/10/2019 | 10/01/2019 | |
Durham, NH | F107 Transmission Line Replacement (Durham) (PDF) (63 pp, 11 MB) | NHG070047 | 02/12/2020 | 06/27/2019 | 06/18/2019 |
Boston, MA | Boston College - Brighton Fields Athletic Complex (PDF) (83 pp, 5.9 MB) | MAG070470 | 06/03/2019 | 05/28/2019 | |
Boston, MA | Kenmore Square North - Beacon Building (PDF) (254 pp, 8.7 MB) | MAG070469 | 05/24/2019 | 05/16/2019 | |
Brookline, MA | 1080 Beacon Street (PDF) (60 pp, 7.2 MB) | MAG070468 | 07/18/2019 | 04/19/2019 | 04/09/2019 |
Dorchester, MA | 233 Hancock Street (PDF) (43 pp, 5.8 MB) | MAG070467 | 06/28/2019 | 04/16/2019 | 04/05/2019 |
Plymouth, MA | Harbourtown - 150 Water Street (PDF) (92 pp, 9.2 MB) | MAG070466 | 03/04/2019 | 02/21/2019 | |
Framingham, MA | PW-388 Marble Street Improvement Project (PDF) (37 pp, 2.8 MB) | MAG070465 | 02/19/2019 | 02/08/2019 | |
Newington, NH | F107 Transmission Line Rebuild - Splice Vault Installation at Gundalow Landing (PDF) (80 pp, 13.3 MB) | MAG070464 | 02/12/2020 | 02/11/2019 | 02/01/2019 |
Babson Park, MA | Babson Commons at Horn Library (PDF) (69 pp, 4.5 MB) | MAG070463 | 12/20/2018 | 12/11/2018 | |
Mashpee, MA | 59 Nick Trail (PDF) (65 pp, 4.5 MB) | MAG070462 | 02/04/2019 | 11/29/2018 | 11/21/2018 |
Boston, MA | The Elizabeth Stone House (PDF) (83 pp, 5.1 MB) | MAG070461 | 11/01/2019 | 11/26/2018 | 11/14/2018 |
Brockton, MA | Brockton Enterprise Garage (PDF) (33 pp, 4.1 MB) | MAG070460 | 06/26/2019 | 11/20/2018 | 11/08/2018 |
Weymouth, MA | Smelt Brook Culvert (PDF) (53 pp, 7.3 MB) | MAG070459 | 11/08/2018 | 11/01/2018 | |
Weymouth, MA | Smelt Brook Culvert (PDF) (53 pp, 6.7 MB) | MAG070458 | 11/08/2018 | 09/20/2018 | 09/11/2018 |
Worcester, MA | Whitla Drive Pump Station (PDF) (39 pp, 4.3 MB) | MAG070457 | 03/05/2018 | 02/23/2018 | |
Wrentham, MA | Route 1 (Washington Street) (PDF) (85 pp, 32.7 MB) | MAG070456 | 02/13/2018 | 02/05/2018 | |
Boston, MA | Chestnut Hill Gatehouse No. 1 (PDF) (12 pp, 3.9 MB) | MAG070455 | 02/05/2018 | 01/29/2018 | |
Concord, MA | Umbrella Community Arts Center (PDF) (67 pp, 6.2 MB) | MAG070454 | 12/12/2017 | 12/01/2017 | |
Nantucket, MA | Cumberland Farms Store #2280 (PDF) (93 pp, 8.4 MB) | MAG070453 | 01/08/2018 | 10/10/2017 | 09/25/2017 |
Easton, MA | Easton Mobile Homes Sewer Repair (PDF) (47 pp, 10.1 MB) | MAG070452 | 08/23/2017 | 08/11/2017 | |
Buckland, MA | Gardner Falls Hydroelectric Facility (PDF) (10 pp, 1.6 MB) | MAG070450 | 07/11/2017 | 06/13/2017 | |
Rowe, MA | Bear Swamp Substation (PDF) (8 pp, 7.5 MB) | MAG070449 | 05/10/2017 | 03/08/2017 | |
Boston, MA | Salerno Place (PDF) (5 pp, 970 K) | MAG070448 | 03/07/2017 | ||
Boston, MA | 46 - 88 Wareham Street (PDF) (19 pp, 18.5 MB) | MAG070445 | 03/31/2017 | 01/18/2017 | |
Boston, MA | 110 Broad Street (PDF) (20 pp, 3.1 MB) | MAG070439 | 10/18/2017 | 03/31/2017 | 01/06/2017 |
South Boston, MA | I-90 Tunnel Remediation (PDF) (64 pp, 5.7 MB) | MAG070444 | 01/26/2017 | 12/15/2016 | |
Cambridge, MA | 121-139 First Street Dewatering Project (PDF) (181 pp, 6.2 MB) | MAG070443 | 01/26/2017 | 11/29/2016 | |
Milford, MA | 445 Main Street (PDF) (34 pp, 7 MB) | MAG070441 | 03/31/2017 | 11/15/2016 | |
Cambridge, MA | EQR - 249 Third Street, LLC (PDF) (72 pp, 19.4 MB) | MAG070442 | 10/30/2018 | 02/02/2017 | 11/02/2016 |
City / Town, State | Site / Address | Permit Number | Date Terminated | Date Issued | Date Posted |