An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Exxon - Mobile Pipeline Company - NPDES Permit No. TX0140092

AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of the Clean Water Act, as amended, (33 U.S.C. 1251 et. seq; the "Act"),

Exxon-Mobile Pipeline Company
22777 Springwoods Village Pkwy
Spring, TX 77389

is authorized to discharge hydrostatic test wastewater from new segments of 8,642 lineal feet of new 36-inch diameter and 2,052 lineal feet of new 42-inch diameter crude oil pipelines that is part of an expansion project at the Exxon’s Webster Station in Harris County, Texas from either Outfall 001 or Outfall 002:

Outfall 001: Latitude: 29o 31’ 25.32” N, Longitude: 95o 06’ 41.38” W
Outfall 002: Latitude: 29o 31’ 23.02” N, Longitude: 95o 06’ 40.07” W

in accordance with this cover page and the effluent limitations, monitoring requirements, and other conditions set forth in Part I, Part II and Part III hereof.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.