AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of the Clean Water Act, as amended, (33 U.S.C. 1251 et. seq; the "Act"),
Exxon-Mobile Pipeline Company
22777 Springwoods Village Pkwy
Spring, TX 77389
is authorized to discharge hydrostatic test wastewater from new segments of 8,642 lineal feet of new 36-inch diameter and 2,052 lineal feet of new 42-inch diameter crude oil pipelines that is part of an expansion project at the Exxon’s Webster Station in Harris County, Texas from either Outfall 001 or Outfall 002:
Outfall 001: Latitude: 29o 31’ 25.32” N, Longitude: 95o 06’ 41.38” W
Outfall 002: Latitude: 29o 31’ 23.02” N, Longitude: 95o 06’ 40.07” W
in accordance with this cover page and the effluent limitations, monitoring requirements, and other conditions set forth in Part I, Part II and Part III hereof.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.- TX0140092 - Final Permit (PDF)(9 pp, 147 K, October 1, 2020)
- TX0140092 - Public Notice (PDF)(1 pg, 10 K)
- TX0140092 - Part III (PDF)(8 pp, 102 K)