Below are EPA's National Pollutant Discharge Elimination System (NPDES) final permit and supporting documents for the Aguirre Power Plant Complex in Salinas, Puerto Rico.
- Permit number: PR0001660
- Effective date: 06/01/2019
- Permit expires: 05/31/2024
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.
- Aguirre Power Plant Complex Final Permit, April 2019 (PDF)(59 pp, 28 MB)
- Aguirre Power Plant Complex Draft Permit, June 2018 (PDF)(61 pp, 1 MB)
- Aguirre Power Plant Complex Fact Sheet, June 2018 (PDF)(27 pp, 2 MB)
- Aguirre Power Plant Complex Draft Permit Modification, September 2013 (PDF)(53 pp, 155 K)
- Aguirre Power Plant Complex Statement of Basis, January 2012 (PDF)(7 pp, 28 K)
- Aguirre Power Plant Complex Public Notice, January 2012 (PDF)(3 pp, 17 K)
- Aguirre Power Plant Complex Final Permit, September 2010 (PDF)(53 pp, 377 K)
- Aguirre Power Plant Complex Response to Comments, September 2010 (PDF)(51 pp, 749 K)