An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Region 8 NPDES Drinking Water General Permit

Due to precautions taken to prevent transmission of COVID-19, Region 8 has limited access to documents mailed or delivered to the Region 8 office. Please mail the original signed Notice of Intent (NOI) to Wastewater Section Chief (8WD-CWW), 1595 Wynkoop Street, Denver, Colorado 80202 and email a scanned copy to Stephanie DeJong (dejong.stephanie@epa.gov). If you are unable to email a scanned copy, please contact us by telephone.

The Region 8 NPDES General Permit for Wastewater Discharges Associated with Drinking Water Production in Indian Country was finalized and public noticed in the Federal Register on April 17, 2019. The final permits are effective as of July 31, 2019 and valid until June 30, 2024. A fact sheet and the permits are provided below.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.