This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

National Pollutant Discharge Elimination System (NPDES)

Status of Nutrient Requirements for NPDES-Permitted Facilities--Non-Majors with Monitoring Requirements

 
Table 4. Number and Percent of Non-major Municipal Sewage Treatment Facilities with Nitrogen (N) and/or Phosphorus (P) Monitoring Requirements for Monitoring Only Purposes or for Compliance with an Effluent Limit

Note that at the time of this data collection from ICIS-NPDES, data for non-major facilities were not required to be entered into the system. Therefore, the data below represent what was in the system at the time of the collection and may not reflect the entire universe of facilities as well as limit and monitoring requirements.

EPA Region State Universe of Non-majors Nitrogen Only
(Number)
Nitrogen Only
(Percent)
Phosphorus Only
(Number)
Phosphorus Only
(Percent)
Both
N and P
(Number)
Both
N and P
(Percent)
Any
(N or P or Both)
(Number)
Any
(N or P or Both)
(Percent)
10 AK 7 0 0 0 0 1 14 1 14
4 AL 259 0 0 1 0 258 100 259 100
6 AR 311 3 1 7 2 7 2 17 5
9 AS(4) 0 0 0 0 0 0 0 0 0
9 AZ 57 1 2 1 2 42 74 44 77
9 CA 85 5 6 5 6 21 25 31 36
8 CO 156 23 15 11 7 7 4 41 26
1 CT(2) 23 0 0 12 52 3 13 15 65
3 DC 0 0 0 0 0 0 0 0 0
3 DE 7 0 0 0 0 4 57 4 57
4 FL(5) 80 4 5 4 5 34 43 42 53
4 GA 192 5 3 25 13 13 7 43 22
6 GM(4) 0 0 0 0 0 0 0 0 0
9 GU(4) 3 0 0 0 0 0 0 0 0
9 HI 0 0 0 0 0 0 0 0 0
7 IA(3),(6) 703 0 0 2 0 6 1 8 1
10 ID 90 1 1 33 37 22 24 56 62
5 IL 398 14 4 47 12 11 3 72 18
5 IN 369 0 0 28 8 0 0 28 8
7 KS 418 4 1 89 21 111 27 204 49
4 KY 182 19 10 3 2 142 78 164 90
6 LA 364 0 0 0 0 13 4 13 4
1 MA 29 8 28 3 10 9 31 20 69
3 MD 127 1 1 1 1 84 66 86 68
1 ME 71 2 3 2 3 0 0 4 6
5 MI 162 0 0 39 24 0 0 39 24
5 MN 287 1 0 8 3 2 1 11 4
7 MO 1,316 30 2 50 4 92 7 172 13
9 MP(4) 1 0 0 0 0 0 0 0 0
4 MS 292 0 0 0 0 78 27 78 27
8 MT 86 3 3 0 0 66 77 69 80
4 NC(2) 264 12 5 0 0 42 16 54 20
8 ND(3) 29 1 3 0 0 0 0 1 3
7 NE 266 19 7 0 0 156 59 175 66
1 NH 13 0 0 7 54 2 15 9 69
2 NJ(3),(7) 141 3 2 23 16 28 20 54 38
6 NM 37 0 0 1 3 4 11 5 14
9 NV 7 1 14 0 0 3 43 4 57
2 NY 388 62 16 57 15 33 9 152 39
5 OH 1,083 67 6 91 8 426 39 584 54
6 OK 201 0 0 4 2 0 0 4 2
10 OR 132 1 1 0 0 1 1 2 2
3 PA 672 0 0 2 0 77 11 79 12
2 PR(4) 17 0 0 0 0 0 0 0 0
1 RI 0 0 0 0 0 0 0 0 0
4 SC 66 3 5 9 14 21 32 33 50
8 SD 171 6 4 8 5 6 4 20 12
4 TN 299 2 1 7 2 40 13 49 16
6 TX(8) 1,323 3 0 11 1 2 0 16 1
8 UT 32 0 0 0 0 28 88 28 88
3 VA(2) 255 0 0 0 0 1 0 1 0
2 VI(4) 12 0 0 0 0 0 0 0 0
1 VT(3) 1 0 0 0 0 0 0 0 0
10 WA(3) 193 15 8 5 3 96 50 116 60
5 WI 467 1 0 11 2 0 0 12 3
3 WV 239 0 0 0 0 60 25 60 25
8 WY(3) 57 0 0 1 2 13 23 14 25
Total   12,440 320 3 608 5 2,065 17 2,993 24

Notes:
(1) Note that all permits with limits should also have corresponding monitoring requirements for each parameter that is limited to track compliance.
(2) These states have watershed-based permitting for multiple dischargers for nutrients. These permits/facilities may not be reflected in this table. (VA - approximately 112 WWTFs covered for N & P; NC - approximately 54 WWTF covered for N; and CT - approximately 79 facilities covered for N)
(3) IA, ND, VT, WA, and WY did not have primary SIC codes entered into the Permit Basic Info section of ICIS for most or all of their facilities. NJ has only entered SIC codes for 46 percent of its individual permittees in ICIS.
(4) The following territories and regions are included in these tables: American Samoa (AS), Gulf of Mexico (GM), Guam (GU), Northern Mariana Islands (MP), Puerto Rico (PR), and U.S. Virgin Islands (VI).
(5) Upon review, this state indicated that it uses other monitoring location codes in addition to the ones used for this analysis. [FL]
(6) Iowa is in the process of transitioning to a new NPDES database and is working to ensuring accurate transfer and migration of required data into the EPA ICIS-NPDES data system. This process is expected to be complete by summer 2017.
(7) This state noted that its data are batch-loaded into ICIS, and therefore there are some errors based on the state's records. [NJ]
(8) This state indicated that the data managed to capture 12 permits that are either for stormwater (MS4) or industrial facilities. [TX]