This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

New Source Review (NSR) Permitting

Drayton Sugar Beet Processing Plant - Permitting Information

1. Facility Information

DRAYTON SUGAR BEET PROCESSING PLANT, DRAYTON, ND

2. Permitting Agency Contact

TOM BACHMAN, (701)328-5188
NORTH DAKOTA STATE DEPT. OF HEALTH
1200 MISSOURI AV., PO BOX 5520
BISMARCK, ND 58520-5520

3. Distance from US/Canada Border

30 Miles

4. Facility Type and Size

DRAYTON SUGAR BEET PROCESSING

5. Sources of Emissions

OILERS & DRYERS

6. Stack Height

N/A

7. Stack Diameter

N/A

8. Permited Fuel(s)

COAL

9. Controlled Emissions Estimate and Control Technology

SOURCES: BOILER, 2 PULP DRYERS;

EMISSION INCREASES:

NOX: BOILER, B616 TPY @ 14 LB/TON COAL, DRYERS @ 0.75 LB/MMBTU;
SO2: 1536 TPY, TILER & DRYERS @ 1.2 LB/MMBTU EACH;
TSP: 323 TPY;
PM10: 323 TPY;
CO: 765 TPY, BOILER @ 5 LB/TON COAL, DRYERS @ 1.75 LB/MMBTU EACH;
VOC: 88 TPY, BOILER 0.07 LB/TON COAL, DRYERS @ 3.0 LB/TON DRIED PULP EACH;
NH3: NO INCREASE, WILL STAY @ 100 TPY.

CONTROLS:

BOILERS NOT SUBJECT TO BACT ANALYSIS;
PULP DRYER #2 - SO2 LIMIT COAL SULFUR TO 1.2 LB/MMBTU & INHERENT O2 REMOVAL, NOX FLUE GAS RECIRCULATION, CO & VOC GOOD COMBUSTION

10. Permit Application Rcvd

02/03/95

Data Entered: 03/02/95