An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

New Source Review (NSR) Permitting

Minergy Detroit, LLC - Permitting Information

1. Facility Information

Minergy Detroit, LLC

2. Location

7819 W. Jefferson Ave, Detroit, MI,  48209

3. Distance from US/Canada Border

3 miles

4. Facility Type and Size

glass aggregate facility (10 t/hr of glass aggregate)

5. Sources of Emissions

550 MMBtu/hr glass furnance; 249 MMBtu/hr boiler; MWWS storage silos

6. Type of Fuel

natural gas

7. Type and Quantity of Emissions

  • glass furnance: PM 39.42 TPY, SO2 236 TPY, NOx 722.7 TPY, CO 306 TPY, VOC 96.36 TPY
  • boiler: PM 0.22 TPY, SO2 0.05 TPY, NOx 17.27 TPY, CO 3.46 TPY, VOC 0.15 TPY
  • storage silos: PM 0.06803 TPY
  • trace elements, such as lead 0.05 TPY, beryllium 0.00096 TPY, arsenic 0.026 TPY, barium 0.76 TPY, mercury 0.045 TPY

8. Emission Control Technology

  • fabric filter for PM/PM-10 and trace metals;
  • fuel control by using a coal flux at minimum available sulfur concentration (0.32%) and dry scrubbing process;
  • Selective Non-Catalytic Reduction system (SNCR) using urea/ammonia upon an optimization study, to control NOx;
  • overfire air system and good combustion practice to control CO emissions;
  • use of high temperature retention, exceeding 1700 degrees Fahrenheit for greater than 2 seconds residence time and good combustion practices to control VOCs, and also as State of Michigan T-BACT for the unregulated toxics, such as acrolein, acrylonitrile and formaldehyde, as well as dioxin and furans, under PSD regulations;
  • vitrification process to minimize solid waste production, produce an inert product, and minimize metal emissions, such as arsenic, beryllium and lead.

9. Date Permit Application Received

6/5/2000

10. Stack Height and Diameter

  • glass furnance 198 ft / 6.17 ft
  • natural gas-fired boiler: shared with furnance
  • dry sludge silo: NA
  • wet sludge silo: NA
  • coal flux silo: 70 ft / 8 in
  • limestone silo: 50 ft / 8 in
  • fly ash silo #1 loading: 45 ft / 8 in
  • fly ash silo #2 unloading: 30 ft / 8 in

11. Permit Agency Contact

Randy Telesz
Michigan Department of Environmental Quality,
Air Quality Division,
Hollister Building,
106 West Allegan Street
PO Box 30260
Lansing, MI, 48909 - 7760

Tel. 517 373- 7089