An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Radiation Protection

EPA's Response to the February 2014 Release of Radioactive Material from the Waste Isolation Pilot Plant (WIPP): EPA's WIPP Air Sampling Data from April 2014

Members of a U.S. Environmental Protection Agency (EPA) environmental monitoring and assessment team spent several weeks at the WIPP site in early April 2014. While at the WIPP facility, EPA reviewed DOE's air sampling plan for monitoring the area in and around the facility, visited DOE's air samplers to review their operations and placed air samplers onsite near existing DOE samplers to independently corroborate DOE's reported results.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.