State: Delaware
Agency: DE- Department of Natural Resources and Environmental Control
Regulation Type: Rule
Rule #: Regulation 1125
Rule Title: Requirements for Preconstruction Review
State Effective Date: 1/11/2020
Final Federal Register Date: 5/1/2020
Federal Register Citation #: 85 FR 25307
Superseded / Rescinded Date: None
Comments:
Historical information -
1. Administrative and non-substantive revisions to all sections. The SIP effective date is 10/12/10.
2. Section 3.0 is amended to include NOx as precursor to ozone. The SIP effective date is 10/20/10.
3. Revised Section 3.2 and 3.7.7.1. - Previous SIP-approved revisions to Section 3.1 for nitrogen dioxide increments and Section 3.9A (now designated as Section 3.10.1) for air quality models remain part of the SIP. Action dated 10/2/12 77 FR 60053 federally effective 11/1/12.
4. Revisions to Sections 1.0, 2.0, and 3.0. The State effective date is 2/11/12, and the SIP effective date is 11/1/12 (77 FR 60053).
5. Correction FRN published 11/6/12 (77 FR 66543).
6. Added definitions of "GHG" and "Subject to Regulation." The SIP effective date is 4/1/13.
7. 10/21/16 - 81 FR 72529. EPA disapporval of regulatory additions to 1125.2.5.5 and 2.5.6 regulatory copy below remains as it was previously approved. SIP effective 11-21-16
8. 85 FR 25307 changed 3.10.1 and 3.10.2 Docket #: 2019–0663. Revised 3.10.1 and 3.10.2. Note: Previous Section 3.0 approval October 2, 2012.
You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.-
Delaware SIP, Chapter 1125 (PDF)(29 pp, 279 K)
Delaware SIP, Chapter 1125