An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Delaware SIP: Regulation 1125, Requirements for Preconstruction Review

State:  Delaware 

 Agency:  DE- Department of Natural Resources and Environmental Control
 
Regulation Type:  Rule
 
Rule #:  Regulation 1125
 
Rule Title:  Requirements for Preconstruction Review

 State Effective Date:  1/11/2020
 
Final Federal Register Date:  5/1/2020


Federal Register Citation #:  85 FR 25307
 
Superseded / Rescinded Date:  None
 
Comments:
Historical information -
 1. Administrative and non-substantive revisions to all sections. The SIP effective date is 10/12/10.
 2. Section 3.0 is amended to include NOx as precursor to ozone. The SIP effective date is 10/20/10.
 3. Revised Section 3.2 and 3.7.7.1.  - Previous SIP-approved revisions to Section 3.1 for nitrogen dioxide increments and Section 3.9A (now designated as Section 3.10.1) for air quality models remain part of the SIP.  Action dated 10/2/12 77 FR 60053  federally effective 11/1/12.
 4. Revisions to Sections 1.0, 2.0, and 3.0. The State effective date is 2/11/12, and the SIP effective date is 11/1/12 (77 FR 60053).
 5. Correction FRN published 11/6/12 (77 FR 66543).
 6. Added definitions of "GHG" and "Subject to Regulation." The SIP effective date is 4/1/13.
 7. 10/21/16 - 81 FR 72529. EPA disapporval of regulatory additions to 1125.2.5.5 and 2.5.6 regulatory copy below remains as it was previously approved. SIP effective 11-21-16

8. 85 FR 25307 changed 3.10.1 and 3.10.2  Docket #: 2019–0663. Revised 3.10.1 and 3.10.2. Note: Previous Section 3.0 approval October 2, 2012.

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.