Oklahoma SIP: OK 252:100- 7, Part 9. Permits By Rule; SIP effective 2017-06-14 (OKd21)
Regulatory Text:
Oklahoma OAC 252 Chapter 100. Air Pollution Control
SUBCHAPTER 7. PERMITS FOR MINOR FACILITIES
PART 9. PERMITS BY RULE
Approved by EPA May 15, 2017 (82 FR 22281) effective June 14, 2017 (OKd21),
Regulations.gov docket EPA-R06-OAR-2007-0989 [OK007]
Sections:
252:100-7.60 Permit by rule
252:100-7-60.1 Cotton Gins
252:100-7-60.2 Grain elevators
252:100-7-60. Permit by rule (7-7)
As adopted in the Oklahoma Register 06/01/1999 (16 Ok Reg 1759) effective 06/11/1999 [7-7],
submitted to EPA February 14, 2002 (OK-25),
Regulations.gov document EPA-R06-OAR-2007-0989-0016 [OK007.16].
Approved by EPA May 15, 2017 (82 FR 22281) effective June 14, 2017 (OKd21),
Regulations.gov docket EPA-R06-OAR-2007-0989 [OK007]
(a) Applicability. A minor facility may be constructed or operated under this rule and will be exempt from any other permitting requirements in this Chapter if it meets the requirements of 100-7-15(b)(1) and this Part.
(b) General requirements.
(1) To construct or operate a facility under a permit by rule, the owner or operator should submit a letter to the Division requesting registration under the appropriate permit by rule. The letter must contain written certification by the owner or operator that the facility will be constructed or operated in compliance with such permit by rule. A construction or operating permit application fee, as specified in 252:100-7-3, must accompany the letter.
(2) In accordance with the requirements of Subchapter 5, an emission inventory shall be submitted to the DEQ every year, except that facilities emitting 5 tons per year or less of each regulated pollutant are required to submit an emission inventory once every 5 years. No other reporting requirements shall apply unless required by NSPS in Subchapter 4 or NESHAP in Subchapter 41.
(3) Compliance inspections will be conducted by the DEQ in response to complaints and on a random basis.
(4) Any change that would cause a facility to no longer qualify for a permit by rule will require the owner or operator to apply for an individual or, if applicable, general permit.
(c) Registration. After receiving the appropriate application fee and certification, the DEQ will acknowledge in writing that the facility is registered to construct or operate under the specified permit by rule. No facility may be constructed or operated under a permit by rule until DEQ issues written acknowledgement of the registration.
***end OK OAC 252:100-7-60***EPA-R06-OAR-2007-0989***OK007***OKd21***d42***x8b***
252:100-7-60.1. Cotton gins. (7-7)
As adopted in the Oklahoma Register 06/01/1999 (16 Ok Reg 1759) effective 06/11/1999 [7-7],
submitted to EPA February 14, 2002 (OK-25),
Regulations.gov document EPA-R06-OAR-2007-0989-0016 [OK007.16].
Approved by EPA May 15, 2017 (82 FR 22281) effective June 14, 2017 (OKd21),
Regulations.gov docket EPA-R06-OAR-2007-0989 [OK007]
See 252:100-23-7.
***end OK OAC 252:100-7-60.1***EPA-R06-OAR-2007-0989***OK007***OKd21***d42***x8b***
252:100-7-60.2. Grain elevators. (7-7)
As adopted in the Oklahoma Register 06/01/1999 (16 Ok Reg 1759) effective 06/11/1999 [7-7],
submitted to EPA February 14, 2002 (OK-25),
Regulations.gov document EPA-R06-OAR-2007-0989-0016 [OK007.16].
Approved by EPA May 15, 2017 (82 FR 22281) effective June 14, 2017 (OKd21),
Regulations.gov docket EPA-R06-OAR-2007-0989 [OK007]
See 252:100-24-7.
***end OK OAC 252:100-7-60.2***EPA-R06-OAR-2007-0989***OK007***OKd21***d42***x8b***
****************** end ok 252:100 subchapter 7, part 9 **************d42**
*end OK OAC 252:100 Subchapter 7 Part 9*EPA-R06-OAR-2007-0989*OK007*OKd21*x8b*
********************** end ok 252:100 subchapter 7 ******************d42***x8b***