This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Texas 30 TAC Chapter 55, Subchapter E, Section 55.152, Public Comment Period, SIP effective August 12, 2019 (TXd217)

Regulatory Text:

Texas Commission on Environmental Quality

55 Chapter 55 – Request for Reconsideration and Contested Case Hearings: Public Comment

55E SUBCHAPTER E : PUBLIC COMMENT AND PUBLIC MEETINGS

55E Section 55.152. Public Comment Period.
As adopted by TCEQ May 9, 2018 effective May 31, 2018 (55-J),
Submitted to EPA July 9, 2018 (TX-410, 39-Y, 55-J, z431),
Regulations.gov document EPA-R06-OAR-2018-0555-0003 [TX205.03].
Approved by EPA July 12, 2019 (84 FR 33172), SIP effective August 12, 2019 (TXd217),
Regulations.gov docket EPA-R06-OAR-2018-0555 [TX205].

Explanation:
SIP includes 55.152(a)(1), (a)(2), (a)(3), (a)(4), (a)(7), (a)(8) and (b).

§55.152. Public Comment Period.

    (a) Public comments must be filed with the chief clerk within the time period
specified in the notice. The public comment period shall end 30 days after the last
publication of the Notice of Application and Preliminary Decision, except that the time
period shall end:
        (1) 30 days after the last publication of Notice of Receipt of Application
and Intent to Obtain Permit under §39.418 of this title (relating to Notice of Receipt of
Application and Intent to Obtain Permit), or 30 days after Notice of Application and
Preliminary Decision if a second notice is required under §39.419 of this title (relating
to Notice of Application and Preliminary Decision), for an air quality permit application
not otherwise specified in this section;
        (2) 30 days after the last publication of the consolidated Notice of Receipt
of Application and Intent to Obtain Permit and Notice of Application and Preliminary
Decision under §39.603 of this title (relating to Newspaper Notice) for a registration
for a concrete batch plant under the Air Quality Standard Permit for Concrete Batch
Plants adopted by the commission under Chapter 116, Subchapter F of this title
(relating to Standard Permits), unless the plant is to be temporarily located in or
contiguous to the right-of-way of a public works project;
        (3) 30 days after the last publication of the consolidated Notice of Receipt
of Application and Intent to Obtain Permit and Notice of Application and Preliminary
Decision under §39.603 of this title for an application for a new permit or permit
amendment under Chapter 116, Subchapters Band G of this title (relating to New
Source Review Permits and Flexible Permits);
        (4) 15 days after the last publication of Notice of Receipt of Application
and Intent to Obtain Permit under §39.418 of this title, or 30 days after Notice of
Application and Preliminary Decision if a second notice is required under §39.419 of
this title, for a permit renewal under Chapter 116 of this title (relating to Control of Air
Pollution by Permits for New Construction or Modification);
        (5) NOT IN SIP
        (6) NOT IN SIP
        (7) the time specified in commission rules for other specific types of
applications; or
        (8) as extended by the executive director for good cause.
    (b) The public comment period shall automatically be extended to the close of
any public meeting.

***end Tx55E§152***SIP effective August 12, 2019***TXd217**TX205***z7n***