An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Texas SIP: 30 TAC 117.100-117.156: Beaumont-Port Arthur Ozone Nonattainment Area Major Sources; SIP effective 2009-01-02 (TXd97) to 2009-09-29

Regulatory Text: 

Texas Chapter 117 - Control of Air Pollution From Nitrogen Compounds

SUBCHAPTER B: COMBUSTION CONTROL AT MAJOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL SOURCES IN OZONE NONATTAINMENT AREAS

DIVISION 1: BEAUMONT-PORT ARTHUR OZONE NONATTAINMENT AREA MAJOR SOURCES
Adopted by TCEQ May 23, 2007 effective June 14, 2007 (7-27).  
Submitted to EPA May 30, 2007.
Approved by EPA December 3, 2008 (73 FR 73562) effective January 2, 2009 (TXd97).

Outline:

§117.100. Applicability. 7-27 (page 38), TXd97

§117.103. Exemptions. 7-27 (page 38), TXd97

§117.105. Emission Specifications for Reasonably Available Control Technology (RACT). 7-27 (page 41), TXd97

§117.110. Emission Specifications for Attainment Demonstration. 7-27 (page 47), TXd97
NOT in SIP: Subsection 117.110(c)

§117.115. Alternative Plant-Wide Emission Specifications. 7-27 (page 49), TXd97

§117.123. Source Cap. 7-27 (page 56), TXd97

§117.130. Operating Requirements. 7-27 (page 63), TXd97

§117.135. Initial Demonstration of Compliance. 7-27 (page 65), TXd97

§117.140. Continuous Demonstration of Compliance. 7-27 (page 67), TXd97

§117.145. Notification, Recordkeeping, and Reporting Requirements. 7-27 (page 75), TXd97

§117.150. Initial Control Plan Procedures. 7-27 (page 80), TXd97

§117.152. Final Control Plan Procedures for Reasonably Available Control Technology. 7-27 (page 83), TXd97

§117.154. Final Control Plan Procedures for Attainment Demonstration Emission 
Specifications. 7-27 (page 86), TXd97

§117.156. Revision of Final Control Plan. 7-27 (page 88), TXd97

**********************************end outline tx7B1d097***************************mxe***
 

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.