An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Texas SIP: 30 TAC 117.1300-117.1356: Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation Sources; SIP effective 2009-01-02 (TXd97) to 2016-05-12

Regulatory Text: 

Texas Chapter 117 - Control of Air Pollution From Nitrogen Compounds

SUBCHAPTER C: COMBUSTION CONTROL AT MAJOR UTILITY ELECTRIC GENERATION SOURCES IN OZONE NONATTAINMENT AREAS

DIVISION 4: DALLAS-FORT WORTH EIGHT-HOUR OZONE NONATTAINMENT AREA UTILITY ELECTRIC GENERATION SOURCES
Adopted by TCEQ May 23, 2007 effective June 14, 2007 (7-27).  
Submitted to EPA May 30, 2007.
Approved by EPA December 3, 2008 (73 FR 73562) effective January 2, 2009 (TXd97).

Outline:

§117.1300. Applicability. 7-27 (page 342), TXd97

§117.1303. Exemptions. 7-27 (page 343), TXd97

§117.1310. Emission Specifications for Eight-Hour Attainment Demonstration. 7-27 (page 344), TXd97
NOT in SIP: Subsection 117.1310(b)

§117.1335. Initial Demonstration of Compliance. 7-27 (page 348), TXd97

§117.1340. Continuous Demonstration of Compliance. 7-27 (page 350), TXd97

§117.1345. Notification, Recordkeeping, and Reporting Requirements. 7-27 (page 354), TXd97

§117.1350. Initial Control Plan Procedures. 7-27 (page 358), TXd97

§117.1354. Final Control Plan Procedures for Attainment Demonstration Emission Specifications. 7-27 (page 360), TXd97

§117.1356. Revision of Final Control Plan. 7-27 (page 361), TXd97

**********************************end outline tx7C4d097***************************mxe***
 

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.