An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Texas SIP: 30 TAC 117.3000-117.3056: Utility Electric Generation in East and Central Texas

Regulatory Text: 
Texas Commission on Environmental Quality

Chapter 117 – Control of Air Pollution from Nitrogen Compounds.

Subchapter E : Multi-Region Combustion Control

DIVISION 1 : UTILITY ELECTRIC GENERATION IN EAST AND CENTRAL TEXAS
As approved by EPA July 31, 2014 (79 FR 44299), effective September 2, 2014 (TXd158), Regulations.gov docket EPA-R06-OAR-2013-0400 [TX150].

Outline:

§117.3000. Applicability. 7-27 TXd97

§117.3003. Exemptions. 7-27 TXd97

§117.3005. Gas-Fired Steam Generation. 7-27 TXd97

§117.3010. Emission Specifications. 7-27 TXd97, 
NOT in SIP: Subsection 117.3010(2)

§117.3020. System Cap. 7-31 TXd158

§117.3035. Initial Demonstration of Compliance. 7-27 TXd97

§117.3040. Continuous Demonstration of Compliance. 7-27 TXd97

§117.3045. Notification, Recordkeeping, and Reporting Requirements. 7-27 TXd97

§117.3054. Final Control Plan Procedures. 7-27 TXd97

§117.3056. Revision of Final Control Plan. 7-27 TXd97

You may need a PDF reader to view some of the files on this page. See EPA’s About PDF page to learn more.