This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Texas SIP: 30 TAC 117.512. Compliance Schedule For Utility Electric Generation in East and Central Texas; SIP effective 2001.04.16

Regulatory Text: 
TNRCC Chapter 117 –  Control of Air Pollution from Nitrogen Compounds

SUBCHAPTER E:  ADMINISTRATIVE PROVISIONS

§117.512.  Compliance Schedule for Utility Electric Generation in East and Central Texas.
As adopted by TNRCC April 19, 2000, effective May 11, 2000

(Approved by EPA March 16, 2001 (66 FR 15195) effective April 16, 2001)

     The owner or operator of each utility electric power boiler or stationary gas turbine located in Atascosa, Bastrop, Bexar, Brazos, Calhoun, Cherokee, Fannin, Fayette, Freestone, Goliad, Gregg, Grimes, Harrison, Henderson, Hood, Hunt, Lamar, Limestone, Marion, McLennan, Milam, Morris, Nueces, Parker, Red River, Robertson, Rusk, Titus, Travis, Victoria, and Wharton Counties shall comply with the requirements of Subchapter B, Division 2 of this chapter (relating to Utility Electric Generation in East and Central Texas) as soon as practicable, but no later than the following dates:

          (1)  May 1, 2003 for units owned by utilities which are subject to the cost-recovery provisions of Texas Utilities Code, §39.263(b); and 

          (2)  May 1, 2005 for all other units.

************* end tx 117.512 adopted April 19, 2000 ****************b351**