This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

Texas SIP: 30 TAC 117.530. Compliance Schedule For Nitric Acid and Adipic Acid Manufacturing Sources; SIP effective 2001.04.16

Regulatory Text: 
TNRCC Chapter 117 – Control of Air Pollution from Nitrogen Compounds

SUBCHAPTER E:  ADMINISTRATIVE PROVISIONS


§117.530.  Compliance Schedule For Nitric Acid and Adipic Acid Manufacturing Sources.
As adopted by TNRCC May 20, 1998, effective June 10, 1998

(As approved by EPA September 1, 2000 (65 FR 53172) effective October 31, 2000)

     All persons affected by the provisions of §§117.301, 117.305, 117.309, 117.311, 117.319, and 117.321 of this title (relating to Adipic Acid Manufacturing) or the provisions of §§117.401, 117.405, 117.409, 117.411, 117.413, 117.419, and 117.421 of this title (relating to Nitric Acid Manufacturing - Ozone Nonattainment Areas) shall be in compliance as soon as practicable, but no later than November 15, 1999 (final compliance date).  All affected persons shall meet the following compliance schedules and submit written notification to the executive director:

          (1)  no later than April 1, 1994, submit a control plan for compliance as specified in §117.309 of this title (relating to Control Plan Procedures) and §117.409 of this title (relating to Control Plan Procedures);

          (2)  conduct applicable continuous emissions monitoring system (CEMS) or predictive emissions monitoring systems (PEMS) performance evaluation and quality assurance procedures as specified in §117.313 of this title (relating to Continuous Demonstration of Compliance) and §117.413 of this title (relating to Continuous Demonstration of Compliance); provide previous testing documentation for any claimed test waiver as allowed by §117.311(d) of this title (relating to Initial Demonstration of Compliance) or §117.411(d) of this title (relating to Initial Demonstration of Compliance); and conduct applicable initial demonstration of compliance testing as specified in §117.311 and §117.411 of this title, by:

               (A)  no later than January 1, 1994, for affected facilities not performing process modification or installation of a CEMS or PEMS device as part of the control plan specified in §117.309 and §117.409 of this title; and

               (B)  no later than November 15, 1999, for affected facilities performing process modification or installation of a CEMS or PEMS device as part of the control plan specified in §117.309 and §117.409 of this title;

          (3)  within 60 days after the applicable date specified in paragraph (2)(A) or (B) of this section, submit the results of CEMS or PEMS performance evaluation and quality assurance procedures and the results of initial demonstration of compliance testing specified in paragraph (2) of this section.