An official website of the United States government.

This is not the current EPA website. To navigate to the current EPA website, please go to www.epa.gov. This website is historical material reflecting the EPA website as it existed on January 19, 2021. This website is no longer updated and links to external websites and some internal pages may not work. More information »

EPA Approved State Source-Specific Requirements in the Washington SIP

Note: The official SIPs are contained in regulations promulgated in the Federal Register and codified in the U.S. Code of Federal Regulations (CFR). EPA’s web-versions of the approved SIPs are for reference. While we make every effort to maintain the accuracy of the files accessible here, inconsistencies may occur. Please contact us if you find any errors in these files.


40 CFR part 52.2470(d)
EPA-Approved State of Washington Source-Specific Requirements 1
Name of Source Order/Permit Number State Effective Date EPA Approval Date Explanations
IBP (now known as Tyson Foods, Inc.) Order Order 02AQER-5074 (PDF)(10 pp, 369 K) 12/6/02 5/2/05
70 FR 22597 (PDF)(3 pp, 148 K, About PDF)
Except finding number 4 (T-BACT) 3.3 of approval condition #3 (Emission Limits & Test Methods).
Boise White Paper LLC Permit Permit 000369-7 (PDF)(8 pp, 112 K) 12/1/04 5/2/05
70 FR 22597 (PDF)(3 pp, 148 K)
Following condition only: 1.Q.1 of item Q.
Boise Cascade, Wallula Mill

Order 1614-AQ04 (PDF)(4 pp, 90 K)

Appendix A (Dust Control Plan)(PDF)(1 pg, 22 K)

9/15/04 5/2/05
70 FR 22597 (PDF)(3 pp, 148 K)
Following conditions only: No. 1 (Approval Conditions) & Appendix A.
Fugitive Dust Control Plan for Simplot Feeders Limited Partnership (PDF)(6 pp, 76 K)   12/1/03 5/2/05
70 FR 22597 (PDF)(3 pp, 148 K)
 
Emission Limits for Significant Stack Sources Various orders (PDF)(5 pp, 155 K) various dates 10/26/95
60 FR 54812 (PDF) (3 pp, 138 K)
 
Holnam, Inc., Ideal Division (now known as Lafarge North America, Inc.) Order #5183 (PDF)(1 pg, 31 K) 2/9/94 8/31/04
69 FR 53007 (PDF) (5 pp, 156 K)
 
Saint Gobain Containers LLC Order #8244 (PDF)(2 pp, 67 K) 9/9/99 8/31/04
69 FR 53007 (PDF) (5 pp, 156 K)
 
Kaiser Order - Alternate Opacity Limit Order 91-01 (PDF)(7 pp, 98 K) 12/12/91 1/27/97
62 FR 3800 (PDF) (4 pp, 130 K)
 
Kaiser Order - Limiting Potential-to-Emit Order 96-03 (PDF)(5 pp, 75 K) 10/4/00 7/1/05
70 FR 38029 (PDF) (10 pp, 1.8 K)
 
Kaiser Order - Limiting Potential-to-Emit Order 96-04 (PDF)(3 pp, 81 K) 4/24/96 1/27/97
62 FR 3800 (PDF) (4 pp, 130 K)
 
Kaiser Order - Limiting Potential-to-Emit Order 96-05 (PDF)(4 pp, 47 K) 10/4/00 7/1/05
70 FR 38029 (PDF) (10 pp, 1.8 K)
 
Kaiser Order - Limiting Potential-to-Emit Order 96-06 (PDF)(3 pp, 82 K) 10/19/00 7/1/05
70 FR 38029 (PDF) (10 pp, 1.8 K)
 
RACT Limits for Centralia Power Plant Order #97-2057R1 (PDF)(30 pp, 705 K) 2/26/98 6/11/03
68 FR 34821 (PDF) (5 pp, 144 K)
 
TransAlta Centralia BART Order #6426 (PDF)(11 pp, 409 K) 12/13/11 12/6/12
77 FR 72742 (PDF) (3 pp, 238 K)
Except the undesignated introductory text, the section titled “Findings,” and the undesignated text following condition 13.
BP Cherry Point Refinery Administrative Order No. 7836, Revision 2 (PDF)(1 pp, 743 K) 5/13/15 2/16/16
81 FR 7710 (PDF) (3 pp, 233 K)
The following conditions: 1.1, 1.1.1, 1.2, 1.2.1, 1.2.2, 2.1, 2.1.1, 2.1.2, 2.1.3, 2.1.4, 2.1.5, 2.2, 2.2.1, 2.2.2, 2.3, 2.3.1, 2.3.2, 2.4, 2.4.1, 2.4.2, 2.4.2.1, 2.5, 2.5.1, 2.5.1.1, 2.5.1.2, 2.5.2, 2.5.3, 2.5.4, 2.6, 2.6.1, 2.6.2, 2.6.3, 2.7, 2.7.1, 2.7.2, 2.7.3, 2.7.4, 2.8, 2.8.1, 2.8.2, 2.8.3, 2.8.4, 2.8.5, 2.8.6, 3, 3.1, 3.1.1, 3.1.2, 3.2, 3.2.1, 3.2.2, 3.2.3, 3.2.4, 4, 4.1, 4.1.1, 4.1.1.1, 4.1.1.2, 4.1.1.3, 4.1.1.4, 5, 5.1, 5.2, 6, 6.1, 6.2, 6.3, 7, 9.
Alcoa Intalco Works Administrative Order No. 7837, Revision 1 (PDF)(14 pp, 671 K) 11/15/10 6/11/14
79 FR 33438 (PDF) (19 pp, 365 K)
The following conditions: 1, 2, 2.1, 3, 4, 4.1, Attachment A conditions: A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11, A12, A13, A14.
Tesoro Refining and Marketing Company Administrative Order 7838 (PDF)(16 pp, 1 MB) 7/7/10 6/11/14
79 FR 33438 (PDF) (19 pp, 365 K)
The following conditions: 1, 1.1, 1.1.1, 1.1.2, 1.2, 1.3, 1.4, 1.5, 1.5.1, 1.5.1.1, 1.5.1.2, 1.5.1.3, 1.5.2, 1.5.3, 1.5.4, 1.5.5, 1.5.6, 2, 2.1, 2.1.1, 2.1.1.1, 2.1.2, 2.1.3, 2.2, 2.2.1, 3, 3.1, 3.1.1, 3.1.2, 3.1.2.1, 3.1.2.2, 3.1.2.3, 3.2, 3.2.1, 3.2.1.1, 3.2.1.2, 3.2.1.3, 3.2.1.4, 3.2.1.4.1, 3.2.1.4.2, 3.2.1.4.3, 3.2.1.4.4, 3.2.1.4.5, 3.3, 3.3.1, 3.4, 3.4.1, 3.4.2, 4, 4.1, 5, 5.1, 6, 6.1, 6.1.1, 6.1.2, 6.1.3, 6.1.4, 7, 7.1, 7.1.1, 7.1.2, 7.1.3, 7.1.4, 7.1.5, 7.2, 7.2.1, 7.2.2, 7.2.3, 7.2.4, 8, 8.1, 8.1.1, 8.1.2, 8.2, 8.2.1, 8.2.2, 8.2.3, 8.3, 8.3.1, 8.3.2, 9, 9.1, 9.1.1, 9.1.2, 9.2, 9.2.1, 9.3, 9.3.1, 9.3.2, 9.3.3, 9.4, 9.4.1, 9.4.2, 9.4.3, 9.4.5, 9.4.6, 9.5, 10, 11, 12, 13, 13.1, 13.2, 13.3, 13.4, 13.5, 13.6.
Port Townsend Paper Corporation Administrative Order No. 7839, Revision 1 (PDF)(7 pp, 295 K) 10/20/10 6/11/14
79 FR 33438 (PDF) (19 pp, 365 K)
The following Conditions: 1, 1.1, 1.2, 1.3, 2, 2.1, 3, 3.1, 4.
Lafarge North America, Inc. Seattle, WA Administrative Revised Order No. 7841 (PDF)(8 pp, 435 K) 7/28/10 6/11/14
79 FR 33438 (PDF) (19 pp, 365 K)
The following Conditions: 1, 1.1, 1.2, 2, 2.1, 2.1.1, 2.1.2, 2.2, 2.3, 3, 3.1, 3.1.1, 3.1.2, 3.1.3, 3.2, 3.3, 4, 4.1, 5, 5.1, 5.1.1, 5.1.2, 5.2, 5.3, 6, 6.1, 7, 7.1, 7.2, 7.3, 7.4, 7.5, 8, 8.1, 8.2, 8.3, 8.4, 8.5, 9, 10, 11, 12.
Weyerhaeuser Corporation, Longview, WA Administrative Order No. 7840 (PDF)(5 pp, 263 K) 7/7/10 6/11/14
79 FR 33438 (PDF) (19 pp, 365 K)
The following Conditions: 1, 1.1, 1.1.1, 1.1.2, 1.1.3, 1.2, 1.2.1, 1.2.2, 1.2.3, 1.3, 1.3.1, 1.4, 2, 2.1, 3, 3.1, 4, 4.1.

1 The EPA does not have the authority to remove these source-specific requirements in the absence of a demonstration that their removal would not interfere with attainment or maintenance of the NAAQS, violate any prevention of significant deterioration increment or result in visibility impairment. Washington Department of Ecology may request removal by submitting such a demonstration to the EPA as a SIP revision.